Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.9202461

- Product Categories
- Friendly Links
- home > Supply > Strengthen the hand push supply 23 chisel hair dryer concrete pavement cutting hair dryer
Information Name: | Strengthen the hand push supply 23 chisel hair dryer concrete pavement cutting hair dryer |
Published: | 2012-11-19 |
Validity: | 365 |
Specifications: | ZM-23B |
Quantity: | 1000.00 |
Price Description: | |
Detailed Product Description: | Strengthen the hand push-type the 23 chisel hair dryer concrete pavement to chiseling machine to strengthen the hand push 23 chiseling machine, embarked propelled road cutting of hair machine multifunction multi-angle concrete chiseling machine single head cutting of hair dryer, napping machine, The ground concrete chisel hair dryer single head of ZM-23B/ZM-11B hand push chiseling machine, to cutting hair dryer strengthen the hand push 23 chisel hair machine main uses: the 23B hand push ground chiseling machine, mainly for the highway bridge face, airports, bridges, parking lots and other concrete floor New pavement removal on the ground surface concrete laitance achieve uniform rough design. The machine also used on the various obsolescence ground to do the floor in front of the refurbished processing, remove broken ground bumps, epoxy, do non-slip surface, do a new surface to play Mao, fully reflects the low cost and high efficiency application value. Strengthen the hand push 23 chisel hair machine parameters: Weight: 150Kg crack down on the number of: 23 * 2200160/min displacement / pressure: 3m3/6KG to chisel comatulid diameter * head number: 31 * 23 width: 566mm chiseling capacity: 60 -80 m / h chisel feather life :1500-2000 ㎡ strengthen the hand push cutting of hair dryer features 23 the: ZM-23B/11B self-locking alloy chisel head, the two machines are interchangeable, using a special alloy technology professional recipe is the other chisel feather 2-3 times the service life. The detachably only can be completed within 2 minutes, without disassembly of the body, the alloy head is embedded in the shoe body, and thereby greatly reduces the labor and parts cost. Latest design, a 50% reduction in air compressor costs 3m3/7KG compressor, usually with a single FC-23B 2 FC-11B combining operation, greatly improving the operating efficiency. Reduce fuel consumption, equipment maintenance, and labor costs. |
Admin>>>
You are the 13576 visitor
Copyright © GuangDong ICP No. 10089450, Shandong coal mining Materials Group Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 13576 visitor
Copyright © GuangDong ICP No. 10089450, Shandong coal mining Materials Group Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility